Deadlock Detection
Tasks point at the tasks they wait for (directed edges). Is there a deadlock — a directed cycle?
Input: the first line has N and M; each of the next M lines has a directed edge u → v (1-based).
Output: YES if a directed cycle exists, else NO.
Constraints:
- 1 ≤ N ≤ 104
- 0 ≤ M ≤ 2×104
- multiple edges and self-loops may appear
Sample Tests
Input 1
3 3 1 2 2 3 3 1
Output 1
YES
Input 2
3 2 1 2 1 3
Output 2
NO
Discussion (opens after you solve — no spoilers before)
No comments yet.